VM2iQTM Energy Management System

Installation and Service Instructions

Visit our website www.usatech.com for an electronic copy of this manual, a video on installation tips, a listing of

Frequently Asked Questions, technical service bulletins and updates to product technical information.

This guide provides you with the information needed to install a VM2iQ into a refrigerated vending machine. Note:

This product is intended for use ONLY in non-perishable beverage venders with maximum compressor size of one (1) horsepower and evaporator fans with a maximum three (3) Amp load. The VM2iQ control system is only to be used with machines that either have the mechanical cold control connections residing in the machine cold box or the electronic compressor relays located in the compressor deck compartment. The VM2iQ should not be used when it is necessary to route the wiring thru the vendor door.

Theory of Operation The VM2iQ is an energy management system that intelligently controls and optimizes the vending machine cooling system. The VM2iQ operates in four modes (Initial Power-On, Normal, Energy Savings and Recovery) to control the cooling system within the machine for optimized energy savings. It monitors the ambient air temperature using a temperature probe and utilizes internal timers to track compressor durations and vend detections. This information is used to control compressor cycles and evaporator fan operation to reduce machine energy consumption while maintaining product temperatures. The VM2iQ works in tandem with the existing electronic or mechanical cold control.

The control performs fault diagnostics to ensure machine reliability and reduced maintenance calls. It detects machine faults such as evaporator coil freeze-ups; condensor/evaporator fan failures; and prevents high head pressure compressor starts. The VM2iQ system displays these failures on its LED and can often resolve them.

VM2iQ Red LED States Flashes twice then On solid at power up to indicate processor and temperature probe operational.

Flashes quickly for several seconds to indicate a vend has been detected.

On solid – Power-up mode, vending machine operates normally for the first 12 hours.

90% On - normal mode, evaporator fan on, vend detected within last 15 minutes.

50% On - normal mode, evaporator fan on, no vend detected within last 15 minutes.

10% On - energy savings mode, compressor off, evaporator fan off.

LED off – Recovery mode, evaporator fan on.

Evaporator Fan VM2iQ Controller Cable Adapters Parts List 1 VM<

–  –  –

Scope of Use The VM2iQ is acceptabe for use in vending machines which use either mechanical or electronic cold controls.

Installation should not be attempted if it is necessary to cut any of the existing wiring. The following is a list of acceptable models of machines for field installation of the VM2iQ.

Dixie Narco - DN168, 180, 276, 300, 348, 360, 368, 414, 432, 440, 501, 522, or 600 cabinets under Series II and Magnum trade names.

Royal Vendors - 480, 550, 640, 650, 654, 660, 768, 780, or 804 cabinets under Merlin IV, GIII, 20Plus, and EZ trade names.

Vendo - 511, 540, 576, 601, 621, 630, 720, 721, or 840 cabinets under Univendor, V21, and VMAX trade names.

Installation Please follow these instructions carefully to insure proper operation of the VM2iQ. Note: This product is intended for use ONLY in UL listed self-contained non-perishable beverage venders with maximum compressor size of one (1) horsepower and evaporator fans with a maximum three (3) Amp load. The VM2iQ control system is only to be used with machines that either have the mechanical cold control connections residing in the machine cold box or the electronic compressor relays located in the compressor deck compartment. In addition the existing electrical/mechanical cold control connections must not reside within the vendor door.

Note: These instructions are intended only for qualified service personnel. Improper installation may result in damage to the machine and/or injury to service personnel. Consult the machine service manual and schematics as necessary for machine component locations and wiring information.

1. Unplug the vending machine from the wall outlet. NEVER attempt to service the vending machine while power is applied to it.

2. Open the door to the machine and gain access to the compressor deck area.

3. Using the self-drilling screws supplied, mount the VM2iQ system in an area of the compressor deck compartment near the machine wiring. Ensure the screws are drilled in areas free of raceways or wire routing to prevent damage to existing wiring. Ensure there is sufficient clearance to plug in the vend detector cable.

4. Using the supplied self-drilling green ground screw connect the VM2iQ wire harness green wire to the side/rear compressor deck wall inside the machine. VM2iQ Ensure the screw is drilled into an area free of raceways or wire routing to Electronic cold control machine prevent damage to existing wiring. shown as an example Note: If any wire connection cannot be made with the existing connectors, utilize the enclosed adapter assemblies (60313/60314) or the supplied wire nuts to make the wire connections as applicable. Installation of the VM2iQ is not recommended for machines were it is necessary to cut any wiring in the existing wire harnesses. Use existing machine wire routing paths when routing any wires. Avoid wire routing near moving parts or sharp edges.





CAUTION! Ensure the ribbed (neutral) wires are connected together on all wire pairs to maintain the polarity of the hot and neutral wires!

5. Locate the cold control system in your machine (electronic relay in the compressor deck compartment or mechanical cold control in the cold box). Note the location of the compressor deck load wires on the cold control or relay and disconnect them from this device. Connect the compressor deck load wire pair to the VM2iQ relay on the top of the VM2iQ controller and connect the VM2iQ wire harness (60311) “Control” pair to the system cold control disconnected earlier in this step. Note - For machines with mechanical cold controls it will be necessary to remove the compressor deck wiring from the cold box and route it directly to the VM2iQ Controller located in the compressor deck compartment. The "Control" wires in the VM2iQ wiring harness will need to be routed with the evaporator fan wiring to the cold box, as described in step 6.

6. Route Vend Detector wire and the VM2iQ wire harness pairs labeled “To Evaporator Fan” and “Power In” from the VM2iQ controller in the compressor deck compartment into the cold box using the existing evaporator fan power wire routing path. The "Control" wire pair will also use the same routing in machines with mechanical cold controls. Do not route any harness/machine wires into the vender door.

USA Technologies, Inc. PN: 23080 rev. 4-07 Copyright 2007 All Rights Reserved VM2iQ Installation and Service Instructions

7. Using the supplied screws, either mount the Vend Detector to the floor or side wall of the cold box near the product vend chute or to the lip of the product vend chute (ensure mounting screws do not interfere with product vending or damage existing wiring). Note, it may be necessary to remove the vend chute during this step. Connect the Vend Detector cable to the miniature phone connector on the VM2iQ controller.

8. Locate and disconnect the evaporator fan load wire pair and reconnect them to the VM2iQ wire harness “To Evaporator Fan” pair. Ensure ribbed (neutral) wires are connected to maintain polarity.

9. Connect the evaporator fan line wire pair disconnected in step 8 to the VM2iQ wire harness “Power In” pair. Ensure ribbed (neutral) wires are connected together to maintain polarity.

10. Connect and lock the VM2iQ wire harness to the VM2iQ Controller.

CAUTION! Ensure that wiring is clear of any moving parts or sharp edges before applying power.

11. While wiring is accessible, apply power to the machine and test the items below:

Ensure the VM2iQ LED blinks twice and then stays ON to indicate the microcontroller and temperature probe are operating normally.

Ensure the evaporator fans start immediately after above LED indication.

Tap the vend detector and ensure the VM2iQ LED blinks. Note VM2iQ only detects one vend every 15 seconds.

Close the machine door open switch and wait five minutes. Ensure the machine compressor starts.

If each item passes, disconnect power to machine and proceed with step12, otherwise follow the Troubleshooting Guide at the end of this manual to correct any problem.

12. Secure wiring with supplied cable ties, reassemble and close wiring access. Apply the machine schematic label (50346) on the cold box door near the existing vendor schematic diagrams. Ensure all wiring is secured clear of moving parts and sharp edges.

13. Ensure air tight seal is maintained in cold box

14. Close the door to the vending machine and apply machine power.

The vending machine should operate normally for the first 12 hours of operation. After this initial 12 hour cool down period, the vending machine will enter energy savings mode if no vends have been detected for more than 15 minutes and the compressor is not on.

Wiring Diagram (After Installation)

–  –  –

VM2iQ Technical Specifications Input VoltageFrequency: 115VAC / 60 Hz Maximum Load: 12 Amps(Steady-State) Power Consumption: Less than 1 Watt(Standby) Operating Temperature: -15 C to 50 C Storage Temperature: -40 C to 85 C Relative Humidity: 95% maximum(Non-condensing) Safety: UL/CN classified, Category SOSR7, File #SA13135 UL/C-UL recognized - XAPX2, XAPX8 standard, File #E243565 Compatibility: Any UL listed self-contained non-perishable beverage vendors with maximum (1) horsepower compressor size and maximum (3) Amp evaporator fans load and having existing cold control connections not residing in the vendor door.

Technical Support

For assistance with the installation or service of the VM2iQ Energy Management System, please contact:

–  –  –

Visit our website www.usatech.com for an electronic copy of this manual, a video on installation tips, a listing of Frequently Asked Questions, technical service bulletins and updates to product technical information.



Similar works:

«Technical Brief Cloud Solutions for Financial Services Technical Brief Summary A global banking organization approached us to get help on a banking services web application aimed at competing with local banks. They wanted to be able to quickly add features and iterate on this application, while still providing a stable, secure experience for their banking customers. To achieve the best ROI, we determined that for development/test environment, a public cloud environment was best because of the...»

«DEVELOPMENT POLICY JOURNAL Vol. 3, April 2003 THE MILLENNIUM DEVELOPMENT GOALS Editor-in-Chief: Stephen Browne Editor: Leelananda De Silva and Shawna Tropp Cover Photography: UNDP Design Consultant: Brendan Yetter The views expressed in this journal are those of the authors. They do not necessarily represent the views of UNDP. Articles may be freely reproduced as long as UNDP is acknowledged. ISSN# 1684-4025 i Contents Foreword Shoji Nishimoto ARE THE MDGS FEASIBLE ? The MDGS: Goals and Targets...»

«Sandeep K. Juneja, Professor School of Technology and Computer Science Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai 400005 E-mail: juneja@tifr.res.in Tel no.: 91-22-2278-2725 (o), 91-22-2280-4842 ®, 91-9967932124 © Academic Experience 12/02 – present Tata Institute of Fundamental Research, School of Technology and Computer Science, Homi Bhabha Road, Mumbai400005. Professor (7/11), Associate Professor (8/04 to 6/11 ); Reader (12/02 to 7/04) 11/96 – 12/03 Indian...»

«WDS'08 Proceedings of Contributed Papers, Part I, 177–185, 2008. ISBN 978-80-7378-065-4 © MATFYZPRESS Constraint Programming for Complex Elastic Scheduling V. Duˇa s Charles University, Faculty of Mathematics and Physics, Prague, Czech Republic. Abstract. Elastic scheduling with alternative resources and precedence constraints is described in this paper. Each activity has defined a time window, in which the whole activity must be processed. The goal is to find a schedule minimizing costs...»

«©The Journal of Risk and Insurance, 1999, Vol. 66, No. 1, 125-137. Confidence Intervals for the Probability of Insolvency in the Insurance Industry Ran Barniv John Hathorn Abraham Mehrez Douglas Kline ABSTRACT Recent literature use logit analysis for point estimators of the probability of insolvency for each insurer based on financial statements data. These studies focus on selecting predictors, comparing classification techniques, and measuring classification accuracy. Our analysis differs...»

«The role of environment in increasing growth and reducing poverty in Uganda Technical Report: Final Gil Yaron and Yakobo Moyini with David Wasike, Maxwell Kabi and Mildred Barungi February 2004 ema Consult GY Associates ema.consult@utlonline.co.ug info@gya.co.uk Technical Report: Final Draft Contents 1 ABBREVIATIONS AND ACRONYMS 1 Introduction 2 Land degradation 2.1Introduction 2.2 The Cost of Soil Erosion and Productivity Loss in Uganda 2.2.1 Local evidence on soil degradation – the Slade...»

«INDUSTRY STUDIES ASSOCATION WORKING PAPER SERIES Searching for Silicon Valley in the Rust Belt: The Evolution of Knowledge Networks in Akron and Rochester By Sean Safford Industrial Performance Center Massachusetts Institute of Technology Cambridge, MA 02139 Industry Studies Association Working Papers WP-2004-06 http://isapapers.pitt.edu/ Searching for Silicon Valley in the Rust Belt: The Evolution of Knowledge Networks in Akron and Rochester Sean Safford Massachusetts Institute of Technology...»

«Copy No. Defence Research and Recherche et développement Development Canada pour la défense Canada & DEFENCE DÉFENSE Development of a CPF Model in UnReal Tournament J. Bennet, J. Frim and D. Tack Humansystems Incorporated Humansystems Incorporated 111 Farquhar St., 2nd floor Guelph, Ontario N1H 3N4 Project Manager: Mark Hazen 902 426-3100 x176 Contract Number: W7707-4-2677/A Contract Scientific Authority: Allan Gillis 902 426-3100 x203 The scientific or technical validity of this Contract...»

«Integral Eye Movement Therapy (IEMT) Practitioner Manual For IEMT Training Designed by Andrew T. Austin Integral Eye Movement Technique and Therapy Practitioner Manual © 2009 Andrew T. Austin Web: www.integraleyemovementtherapy.com Tel: 07838 387580 Email: NLP@hotmail.co.uk What Is Integral Eye Movement Therapy Integral Eye Movement Technique is a brief change work process that generates rapid change in the area of undesired emotional and identity imprints. The process and algorithms of the...»

«55 th EOQ Congress June 21, 2011 (Tuesday) CONCURRENT SESSIONS Tuesday 13:30 – 17:30 KEMPINSKI HOTEL CORVINUS Erzsébet tér 7-8, Budapest V. REGINA BALLROOM I.10.2. INNOVATION AND QUALITY II. Session Chair: Kostas N. Dervitsiotis, University of Piraeus, Greece 15.30 Innovations and Quality for Higher Competitiveness of Companies Devender Malhotra and Shalabh Srivastava, Wipro BPO, India Malhotra, Devender (India) Head of Quality and Customer Advocacy Group, Wipro BPO, India. He has over 15...»

«Research in Human Development, 6(2–3), 144–164, 2009 Copyright © Taylor & Francis Group, LLC ISSN: 1542-7609 print/1542-7617 online DOI: 10.1080/15427600902911247 Mediation Models for Longitudinal Data 1542-7609 Human Development Research \, Vol. in 1542-7617 HRHD6, No. 2, April 2009: pp. 1–32 in Developmental Research James P. Selig and Kristopher J. Preacher MEDIATION MODELS FOR LONGITUDINAL DATA Selig and Preacher University of Kansas Mediation models are used to describe the...»

«PHYSICAL MODELING OF AIRFLOW-WALLS INTERACTIONS TO UNDERSTAND THE SLEEP APNEA SYNDROME Y. Payan1, X. Pelorson2 and P. Perrier2 (1) TIMC/GMCAO, Institut Albert Bonniot, UMR CNRS 5525 & Université Joseph Fourier, Domaine de la Merci, 38706 La Tronche Cedex, France. Yohan.Payan@imag.fr (2) Institut de la Communication Parlée, INPG-Univ. Stendhal, UMR CNRS Q5009, 46 Ave. Félix Viallet, F-38031 Grenoble Cedex, France. 1. ABSTRACT Sleep Apnea Syndrome (SAS) is defined as a partial or total closure...»





 
<<  HOME   |    CONTACTS
2017 www.thesis.dislib.info - Online materials, documents

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.